Thursday, 29 August 2013

Wessex Primary School, Golders Green, London

The Brief        

To update and modernise the toilets to the nursery class and middle school. Target for completion three weeks.

The Project
The existing dated cubicles, flooring, fixtures and fittings were removed and cleared and the area prepared.
New hidden WC cisterns were installed behind purpose made panels and cubicles.
We replaced the existing basins with a purpose made Corian trough basin set on a purpose made vanity unit to match the cubicles.
Taps are electric sensor taps which will come on when the hand is passed in front.
WC’s are flushed electronically via an infra-red sensor set into the panel, a wave of the hand over this will flush the toilet and hence hygienic solution.
In the nursery toilets a fish motif was introduced onto the door panels for the younger children.
Flooring was replayed with Gerflex safety flooring which has a seamless finish and has been taken up the walls to form a skirting which will aid cleaning.
The toilets were decorated in brilliant white to give an overall feel of brightness.

The Result

A clean, modern and easily maintained toilet area.
Completed works in two weeks during the summer holidays which enabled the cleaning staff to undertake the deep clean to the classrooms a week ahead of schedule which was appreciated by the resident caretaker.







Holiday Home - Hastings

The Brief

The house required extensive modernisation not having been attended to for more than 40years.
To refurbish and modernise Victorian seaside home. The client wants a clean feel and look.

The Project

All the wall and ceiling plaster to the property was lath and plaster and blown. The lath and plaster was removed and all walls and ceilings were plaster boarded and set in finish plaster.
A modern kitchen and bathroom were fitted.
All floors were repaired with reclaimed boards and all were sanded to bare wood and varnished to a high gloss finish.
The original cornice was retained and repaired to match.
Period fittings were used throughout the living areas.

The Result

The house has been given a new lease of life which it is expected will last many years.


Garage Conversion - Maidstone

The Brief

Mr & Mrs C have a three bedroom semi-detached house and three growing boys. Mrs C wanted a 'sanctuary' to call her own.
To achieve this a garage conversion was suggested.

The Project

We designed a garage conversion as a bedroom for Mr & Mrs C with a rear extension to form a laundry room and WC.

The Result

"I now have my own space with which I am extremely happy. Geof and John worked through a very cold spell. We are extremely happy with the result and would recommend G&H to friends and family"

Mrs C - Maidstone

Bannatyne Spa Hotel - Hastings

The Brief

To refurbish a large part of the hotel to reflect the Bannatyne brand. It was important that the work, although extensive, caused minimum disruption to the guests as the hotel was to remain open during the work.

The Project

A total of twenty-two bedrooms including five superior rooms were completely refurbished. Work included upgrading the bathrooms using luxury fittings and Porcelnosa tiles throughout. The superior rooms had freestanding baths integrated in the open plan bedrooms.

The restaurant and function (garden) rooms were refurbished which included building new partitioning walls, laying carpet and solid oak flooring.

The Result

"As a direct result of G&H Building Services commitment and flexibility. The hotel looks better than I have ever seen it so many thanks to Geof and his team for all their hard work to meet the required deadlines."

General Manager - Bannatyne Spa Hotel Hastings